This interim provision is prepared to standardize the engineering design of natural disaster and foreign object intrusion monitoring system for railway (hereinafter abbreviated as disaster monitoring system or DMS for short).This interim provision is applicable to DMS engineering design for new railway lines or reconstructed ones.
1 General Provisions 2 Basic Requirements 3 Center System of Railway Administration 4 Field Monitoring Equipment 5 System Network andlts Security 6 Transnussion Lines and Power Supply Lines 7 Operation Environment 8 Interface Design 9 The Miscellaneous Explanation of Wording in this Interim Provision